|
|
BaggageBay08Ann
Date: 10/23/2005
Views: 3499
|
|
|
Landing_Gear_2
Date: 01/28/2006
Views: 3901
|
|
|
|
13062003173406_G
Date: 12/31/1969
Views: 3736
|
|
|
Fin rib conduit 4.
Date: 04/14/2009
Views: 7917
|
|
|
|
DSC00254
Date: 12/31/1969
Views: 5711
|
|
|
Heims overall length cut down to 1.700"
Date: 12/16/2013
Views: 7223
|
|
|
|
dscn0041
Date: 12/31/1969
Views: 4454
|
|
|
DSCN3912
Date: 09/30/2005
Views: 5289
|
|
|
|
CBM - 37 - FINISHING(1)
Date: 11/18/2013
Views: 5146
|
|
|
PH-DIY-033_982
Date: 11/25/2009
Views: 5944
|
|
|
|
Door sill conduit run 21.
Date: 08/13/2010
Views: 8012
|
|
|
IMG_5316
Date: 03/19/2013
Views: 8750
|
|
|
|
109_0978_IMG_2
Date: 01/28/2004
Views: 6300
|
|
|
dsc08642
From the start the airframe was sitting 2.5 deg tail low and 0.1 deg to port. Not bad for just putting her on there. I jacked up the back of the trailer to get it as near to 0.0 as possible and also shifted the airframe latterly to turn that .1 to 0.0 a
Date: 04/15/2012
Views: 27525
|
|
|
|
24022003210213_G
Date: 12/31/1969
Views: 3448
|
|
|
Panel_09
Date: 01/23/2006
Views: 4311
|
|
|
|
IMG_0147
Date: 04/14/2005
Views: 5003
|
|
|
CH11_6
Date: 12/31/1969
Views: 7721
|
|
|
|
DSC00310
Date: 12/31/1969
Views: 5020
|
|
|
IMG_0108_001
Date: 12/02/2006
Views: 5143
|
|