|
|
CBM - ANNEX D
Date: 11/18/2013
Views: 4436
|
|
|
IMG_2063
Date: 12/01/2004
Views: 8160
|
|
|
|
Seamed 1.
Date: 04/03/2009
Views: 6076
|
|
|
DSCN6332
Date: 10/11/2009
Views: 5546
|
|
|
|
Pic_in_pic
Date: 03/26/2009
Views: 6526
|
|
|
CG evaluation will likely be needed after we complete wiring!
Date: 03/18/2009
Views: 4441
|
|
|
|
03072003095936_G
Date: 12/31/1969
Views: 4248
|
|
|
IMG_2477
Date: 02/13/2006
Views: 5831
|
|
|
|
img0909copy
Date: 07/29/2007
Views: 4254
|
|
|
Trying not to mar flap cross tube too bad with Upstops 6 of 7
Date: 12/26/2013
Views: 13445
|
|
|
|
DSCN8198
Date: 09/18/2010
Views: 7206
|
|
|
IMG_0949Ann
Date: 08/01/2007
Views: 5814
|
|
|
|
Door tang and hinge drilling tools 1.
Date: 11/01/2009
Views: 4661
|
|
|
IMG_7014
Next catch was where the filler needed to go into its' position. There was a piece blocking which had to be removed.
Date: 10/23/2013
Views: 11862
|
|
|
|
DSCF0001_2
Date: 08/03/2009
Views: 10144
|
|
|
IMG_5683Ann
Date: 10/05/2007
Views: 6303
|
|
|
|
IMG_1416
End of May. Applied primer to all the repaired and patched areas. Port wing outboard flap bracket area.
Date: 05/31/2011
Views: 6372
|
|
|
110_1083_IMG
Date: 03/10/2004
Views: 6511
|
|
|
|
IM002958
Date: 10/30/2007
Views: 8231
|
|
|
DSCN5993Ann
Date: 05/04/2007
Views: 4273
|
|