|
|
StrobeWireBagBay
Date: 02/08/2004
Views: 4561
|
|
|
IMG_3095Ann
Date: 01/17/2009
Views: 5743
|
|
|
|
IMG_1408
Still working on the brake plumbing. The translucent nylon was not fitting properly. Going back to the black stuff.
Date: 05/27/2011
Views: 6079
|
|
|
Front HardPoint 11
Date: 12/31/2013
Views: 13480
|
|
|
|
021002_Navlite2
Date: 12/31/1969
Views: 4658
|
|
|
photo-0.JPG
Date: 08/22/2012
Views: 35061
|
|
|
|
IMG_2510
Date: 04/25/2006
Views: 6215
|
|
|
2005_1_16_32
Date: 02/03/2009
Views: 6364
|
|
|
|
DSCN6078
Date: 10/11/2009
Views: 7358
|
|
|
107_0789_IMG
Date: 10/03/2003
Views: 25992
|
|
|
|
IM003520
Date: 11/01/2007
Views: 8769
|
|
|
DSCF0039
Date: 10/27/2009
Views: 8279
|
|
|
|
Control_Systems_19
Date: 01/23/2006
Views: 10086
|
|
|
SingletonFirewall18Ann
Date: 04/15/2006
Views: 4485
|
|
|
|
Front fuse conduit run 9.
Date: 09/08/2010
Views: 9189
|
|
|
IMG_7233
2-ply fiberglass strips were made up to be bonded to the inside of the unit. These strips went on all 4 sides. Here the strip is being bonded to the aft wall.
Date: 01/26/2014
Views: 11940
|
|
|
|
IMG_6147post
Date: 08/09/2009
Views: 5078
|
|
|
DSCN0034
Date: 10/10/2009
Views: 5358
|
|
|
|
Landing_Gear_50
Date: 01/23/2006
Views: 3700
|
|
|
Upholstery 2
First step is to do everything around the instrument module where it will be difficult to get at once it is installed. Finish of the plane is critical since no matter how well built, the finish is wahta you will be looking at the rest of your flying life.
Date: 03/05/2018
Views: 8788
|
|