|
CH6_1
Date: 12/31/1969
Views: 5949
|
|
|
IMG_6139
2013 05 13 A very large quarry near Bridgeport.
Date: 05/13/2013
Views: 5301
|
|
|
p1000721
p1000721.jpg
Date: 03/12/2012
Views: 11971
|
|
|
IMG_2382
Date: 08/13/2005
Views: 5505
|
|
|
Port spar pin washer retention 1.
Date: 10/26/2010
Views: 5805
|
|
|
Sttroberr_8
Date: 05/20/2009
Views: 5204
|
|
|
IMG_7688.jpg
Date: 08/05/2012
Views: 18428
|
|
|
dsc08618
Block and tackle used to hoist the front of the aircraft to aid in creating a jig. This hoist reduces the weight to 25%.
Date: 04/14/2012
Views: 35702
|
|
|
20Port_flap_down_taken_from_rear
Date: 12/31/1969
Views: 6533
|
|
|
Control_Systems_05
Date: 01/23/2006
Views: 3932
|
|
|
DSC00285
Date: 12/31/1969
Views: 4606
|
|
|
20040219193826_G
Date: 12/31/1969
Views: 4602
|
|
|
Mutilated 180 degree D-sub shell to be a 90 degree.
Date: 03/13/2009
Views: 9809
|
|
|
IMG_0025post
Date: 08/30/2010
Views: 6054
|
|
|
The_other_side_bushings_look_fine_001
Date: 12/08/2007
Views: 48977
|
|
|
Fred fairing install 2.
Date: 04/04/2008
Views: 4279
|
|
|
15112003123056_G
Date: 12/31/1969
Views: 3487
|
|
|
3M Flowable Finishing Putty 1.
Date: 10/07/2009
Views: 7142
|
|
|
CH9S_6
Date: 12/31/1969
Views: 5379
|
|
|
IMG_1672
Date: 06/24/2004
Views: 5220
|
|