|
30052002194427_G
Date: 12/31/1969
Views: 3902
|
|
|
DSCN8262
Date: 09/18/2010
Views: 5157
|
|
|
img0221copy
Date: 07/29/2007
Views: 3573
|
|
|
nex_2014_01_25_06
Mains on the ground for the first time.
Date: 01/25/2014
Views: 18737
|
|
|
IMG_9571post
The fuel lines were tied with tie-wraps and 1/2" (12.7 mm) rubber fuel hose lengths. The vent hose was tied in as well by running it through short lengths of fuel hose and using tie-wraps to hold the rubber hose and protect the vent line from chafin
Date: 06/12/2010
Views: 5532
|
|
|
P8310072
Date: 08/31/2007
Views: 6882
|
|
|
DSCN4410Ann
Date: 06/11/2006
Views: 3116
|
|
|
24_G
Date: 06/19/2009
Views: 4498
|
|
|
IMG_0723
Date: 10/31/2005
Views: 4207
|
|
|
DSCN5657Ann
Date: 04/02/2007
Views: 6076
|
|
|
11_G
Date: 06/19/2009
Views: 4064
|
|
|
DSC01556_Texted_001
Date: 12/31/1969
Views: 4663
|
|
|
050802_flapslot
Date: 12/31/1969
Views: 3868
|
|
|
IMG_1610
Date: 06/08/2004
Views: 4985
|
|
|
IMG_2555
Now you can observe the reservoir from below the aircraft where you control the run of fluid into the brake.
Date: 03/12/2012
Views: 5136
|
|
|
AileronTrim10
Date: 08/19/2003
Views: 4437
|
|
|
Making awful fit of lift pads correct 35.
Date: 10/15/2010
Views: 4642
|
|
|
dsc08608
These will have to go. They are on top and I will remove them and put one vent on the bottom.
Date: 04/10/2012
Views: 36837
|
|
|
kemble EGBP
Kemble EGBP
Date: 07/02/2005
Views: 6011
|
|
|
2005_2004_10_10_007_1
Date: 02/04/2009
Views: 3769
|
|