| 
 | 
 
Option C) Electrical Box install 2 of 3.
 
Date: 08/12/2003
 
Views: 9077
 
 
 | 
 | 
 | 
 
cliff8
 
Date: 12/31/1969
 
Views: 9218
 
 
 | 
 | 
| 
 | 
 
Ron_and_Ryszard_Y9_06_07_001
 
Date: 06/07/2009
 
Views: 5301
 
 
 | 
 | 
 | 
 
IMG_1595
 
Date: 06/08/2004
 
Views: 5683
 
 
 | 
 | 
| 
 | 
 
CH5_2
 
Date: 12/31/1969
 
Views: 6214
 
 
 | 
 | 
 | 
 
DSCF0681
 
Date: 08/01/2003
 
Views: 6523
 
 
 | 
 | 
| 
 | 
 
2006SnF017
 
Date: 04/07/2006
 
Views: 4661
 
 
 | 
 | 
 | 
 
IMG_3394
 
Date: 10/24/2010
 
Views: 9077
 
 
 | 
 | 
| 
 | 
 
Fitting_Wings_02
 
Date: 06/07/2007
 
Views: 5382
 
 
 | 
 | 
 | 
 
Rigging descision 2.5 Starboard, 2.4 Port and droop port flap .110 at root 3.
 
Date: 10/25/2010
 
Views: 6529
 
 
 | 
 | 
| 
 | 
 
DSC_0041
 
Date: 08/31/2007
 
Views: 4164
 
 
 | 
 | 
 | 
 
DSCN6052
 
Date: 11/29/1999
 
Views: 5598
 
 
 | 
 | 
| 
 | 
 
CH26_2
 
Date: 12/30/2005
 
Views: 4683
 
 
 | 
 | 
 | 
 
IMG_0391
 
Date: 05/01/2005
 
Views: 5235
 
 
 | 
 | 
| 
 | 
 
EISWiringLabels01Ann
 
Date: 05/31/2004
 
Views: 4814
 
 
 | 
 | 
 | 
 
dscn0338
 
Date: 12/31/1969
 
Views: 4053
 
 
 | 
 | 
| 
 | 
 
DSCN6609
 
Date: 10/25/2009
 
Views: 5247
 
 
 | 
 | 
 | 
 
DSC00896
 
Date: 04/15/2005
 
Views: 4713
 
 
 | 
 | 
| 
 | 
 
IMG_6425
 
Date: 04/26/2017
 
Views: 8698
 
 
 | 
 | 
 | 
 
IMG_9571post
 
The fuel lines were tied with tie-wraps and 1/2" (12.7 mm) rubber fuel hose lengths.  The vent hose was tied in as well by running it through short lengths of fuel hose and using tie-wraps to hold the rubber hose and protect the vent line from chafin
 
Date: 06/12/2010
 
Views: 5964
 
 
 | 
 |