|
|
DSCF0026
Date: 01/17/2010
Views: 7579
|
|
|
Battery15Ann
Date: 04/30/2005
Views: 3572
|
|
|
|
IMG_2288
Date: 03/12/2005
Views: 5274
|
|
|
Completion of Port top skin bond on 65.
Date: 09/22/2010
Views: 5812
|
|
|
|
Bb5
Date: 02/01/2009
Views: 6755
|
|
|
TrimRelayDeck05small
Date: 04/13/2005
Views: 4139
|
|
|
|
Wing connections 3.
Date: 05/05/2009
Views: 6401
|
|
|
Mod65_11
Date: 05/04/2005
Views: 6730
|
|
|
|
FuelSystemMod16
Date: 10/03/2003
Views: 7002
|
|
|
Composite rivets 3.
Date: 09/08/2009
Views: 5292
|
|
|
|
dsc08641
Was going to use another plywood rib here but decided that the wide strap works fine. I later added some foam to the strap to give it some padding.
Date: 04/15/2012
Views: 21308
|
|
|
CH37_03
Date: 12/31/1969
Views: 10809
|
|
|
|
Ceiling camera stud 2
Date: 04/12/2009
Views: 6114
|
|
|
IMGA0701
First wings L.E layed up and peel plyed. The blue foam is keeping in place a 90 degree strip which is keeping the end of the uni cloth bent under to aid bonding to the rear of the spar. A helpful tip from Mike Gregory.......Oh wanted to say it took 8 and
Date: 04/20/2013
Views: 105559
|
|
|
|
IMG_0015_001
Date: 05/24/2007
Views: 6235
|
|
|
DSCN6672
Date: 10/25/2009
Views: 4729
|
|
|
|
p2
Date: 10/15/2008
Views: 5764
|
|
|
IMG_0970Ann
Date: 08/06/2007
Views: 4432
|
|
|
|
Oil Pressure sender disected.
Date: 08/09/2010
Views: 4998
|
|
|
Mod65_6
Date: 12/31/1969
Views: 6377
|
|