|
|
IMG_0164post
Date: 09/05/2010
Views: 4303
|
|
|
Door tang and hinge drilling tools 1.
Date: 11/01/2009
Views: 4772
|
|
|
|
CockpitModuleReinforcementPort
Date: 10/07/2003
Views: 6173
|
|
|
Rotax 914 TCU control wiring.
Date: 04/23/2009
Views: 11139
|
|
|
|
IMG_0847post
Spent the rest of the day helping Gary.
Date: 01/22/2010
Views: 5062
|
|
|
dscn1056
Date: 12/31/1969
Views: 3725
|
|
|
|
dscn0380
Date: 12/31/1969
Views: 4452
|
|
|
IM001868
Date: 10/29/2007
Views: 8791
|
|
|
|
DSC00915
Date: 04/15/2005
Views: 7864
|
|
|
DSC01183
Date: 12/31/1969
Views: 7234
|
|
|
|
Fuselagewing_fairingfillet 6
Date: 04/04/2008
Views: 5703
|
|
|
IMG_9571post
The fuel lines were tied with tie-wraps and 1/2" (12.7 mm) rubber fuel hose lengths. The vent hose was tied in as well by running it through short lengths of fuel hose and using tie-wraps to hold the rubber hose and protect the vent line from chafin
Date: 06/12/2010
Views: 6833
|
|
|
|
032602_doorhinge4
Date: 12/31/1969
Views: 3814
|
|
|
Steel_circuit_board_2
Date: 04/30/2009
Views: 7849
|
|
|
|
Fuel_System_5
Date: 04/15/2006
Views: 4557
|
|
|
IMG_4420
Date: 12/28/2011
Views: 10967
|
|
|
|
DSC_0279
Date: 05/15/2008
Views: 5917
|
|
|
Door sill conduit run 26.
Date: 08/15/2010
Views: 6729
|
|
|
|
Uncle Bob schmoozing.
Date: 08/31/2010
Views: 8580
|
|
|
TailWheelMount03
Date: 02/02/2004
Views: 3899
|
|