|
|
Prestwick_Scotland_EGPK_1_6_09_air_to_air_Tanker
Date: 06/01/2009
Views: 5848
|
|
|
IMGA0952
Finally done. 6 months start to finish
Date: 09/11/2017
Views: 188767
|
|
|
|
DSCN5752Ann
Date: 04/19/2007
Views: 4428
|
|
|
112302_wintip
Date: 12/31/1969
Views: 4451
|
|
|
|
Aft fuse conduit run 4.
Date: 08/16/2010
Views: 8045
|
|
|
DSCF0009_001
Date: 08/18/2009
Views: 7283
|
|
|
|
Relieved for starter switch and starter LED.
Date: 07/19/2010
Views: 6271
|
|
|
DSCN3932
Date: 09/30/2005
Views: 4938
|
|
|
|
IMG_0313post
Date: 09/18/2010
Views: 8103
|
|
|
Paul cradle 5
Date: 02/21/2010
Views: 6024
|
|
|
|
Running and connecting "Fat" wires 10.
Date: 01/05/2011
Views: 17477
|
|
|
Sternpost04Ann
Date: 06/12/2004
Views: 3855
|
|
|
|
IM001316
Date: 10/30/2007
Views: 8690
|
|
|
StbdWingAileronHinge02
Date: 06/04/2003
Views: 6549
|
|
|
|
New_Cowl_01
New lip on cowl. A hole 14" X 7" was opened in the cowl. A piece of 4" PVC was used as a mold to form a lip on the edge of it, the idea being to create a low pressure area.
Date: 08/31/2011
Views: 186740
|
|
|
dscn0641
Date: 12/31/1969
Views: 4156
|
|
|
|
Web_Site_25
Date: 03/25/2004
Views: 5650
|
|
|
dscn2750
Date: 12/31/1969
Views: 4805
|
|
|
|
DSCN1877_Texted_001
Date: 12/31/1969
Views: 4147
|
|
|
nex_2013_08_24_01
Stb. side ribs 3 and 4 epibond in place with the 3 layups on all sides. At this point I was getting faster at doing layups however I only did one side at a time.
Date: 08/25/2013
Views: 17703
|
|