|
|
nex_2014_01_25_03
Port side dirty work. Just test fitting final install with all hardware will be after the legs are painted.
Date: 01/25/2014
Views: 20864
|
|
|
InstrumentPanel103Ann
Date: 12/26/2005
Views: 3831
|
|
|
|
Upright reinforced joints 1 of 2.
Date: 08/12/2003
Views: 10310
|
|
|
Door sill conduit run 24.
Date: 08/14/2010
Views: 7133
|
|
|
|
IMG_0077Ann
Date: 09/28/2008
Views: 9410
|
|
|
Time to figure warning wire run 1.
Date: 06/12/2010
Views: 7260
|
|
|
|
LX-CWT Mod 51 alternative 2
Date: 07/15/2010
Views: 8435
|
|
|
Prop_Tip_Covers
Date: 12/31/1969
Views: 5600
|
|
|
|
Melted metal together (TIG), then Self Etch Primer
Date: 11/28/2013
Views: 7563
|
|
|
InstrumentPanel54Ann
Date: 09/21/2004
Views: 4464
|
|
|
|
DSCN3834
Date: 06/05/2005
Views: 5505
|
|
|
Mass_Balance_Tower_20
Date: 01/23/2006
Views: 5985
|
|
|
|
Cutting out fuse panel 3.
Date: 04/18/2009
Views: 5854
|
|
|
IMAG0234
Date: 10/19/2012
Views: 22018
|
|
|
|
nex_2014_01_12_05
Port side top.
Date: 01/13/2014
Views: 18402
|
|
|
DSCN6313
Date: 10/11/2009
Views: 5575
|
|
|
|
Flap_Motor_Installation_06
Date: 11/27/2007
Views: 5451
|
|
|
DSCN5471Ann
Date: 01/14/2007
Views: 5582
|
|
|
|
DSCN6322
Date: 10/11/2009
Views: 5304
|
|
|
IMG_0458ann
I've gone back to the build manual and made up a pair of reinforcements. Here marking where the upholstery will be cut to make a place for them.
Date: 10/20/2010
Views: 4990
|
|