|
|
Making awful fit of lift pads correct 12.
Date: 10/12/2010
Views: 7005
|
|
|
InstrumentPanel100Ann
Date: 12/25/2005
Views: 4163
|
|
|
|
FWF-10 (15)
Date: 03/06/2010
Views: 7754
|
|
|
092402_Filling
Date: 12/31/1969
Views: 4136
|
|
|
|
DSCN5250Ann
Date: 12/17/2006
Views: 4298
|
|
|
Spar ramp 7.
Date: 11/01/2010
Views: 6769
|
|
|
|
DSCF0759
Date: 08/03/2003
Views: 6665
|
|
|
IMG_0002
Date: 04/27/2007
Views: 5103
|
|
|
|
DSCN6228
Date: 10/11/2009
Views: 4945
|
|
|
Troys holder 2
Date: 02/24/2010
Views: 6831
|
|
|
|
DSCN6312
Date: 10/11/2009
Views: 5037
|
|
|
dscn2201
Date: 12/31/1969
Views: 4333
|
|
|
|
DSCF0083
Date: 04/02/2009
Views: 5512
|
|
|
Mass_Balance_Tower_46
Date: 01/23/2006
Views: 4649
|
|
|
|
ComAntenna2_04Ann
Date: 12/15/2005
Views: 3594
|
|
|
IMG_3214
Then I removed all the cheep crap connectors (with folded sheet metal pins) provided with the gage package, re-ran all the wiring and replaced the cheep connectors with good, 9-pin, sub-D connectors.
Date: 05/17/2012
Views: 6047
|
|
|
|
IMG_6424
Date: 04/24/2017
Views: 9805
|
|
|
1stAssembly
Date: 12/31/1970
Views: 12895
|
|
|
|
nex_2013_08_24_01
Stb. side ribs 3 and 4 epibond in place with the 3 layups on all sides. At this point I was getting faster at doing layups however I only did one side at a time.
Date: 08/25/2013
Views: 17520
|
|
|
Lodrino_Switzerland_2002
Date: 12/31/1969
Views: 3766
|
|