|
|
IMG_1364
Decided it was time to put the cowl back on as I needed to work on the nose gear leg fairing. Cowling did not fit right.
Date: 05/17/2011
Views: 5416
|
|
|
DSC_0281
Date: 05/15/2008
Views: 5529
|
|
|
|
IMG_7366
Applying the fiberglass/epoxy strips to the port side. Plastic wrap to prevent the epoxy from bonding to the tools used to hold the strip in place.
Date: 02/22/2014
Views: 9856
|
|
|
DSCF0043_001
Date: 09/08/2009
Views: 4959
|
|
|
|
DSCN5098
Date: 11/29/1999
Views: 6944
|
|
|
IMG_7676Ann
Date: 04/27/2008
Views: 4012
|
|
|
|
StrobeMount01_001
Date: 02/15/2004
Views: 3805
|
|
|
IMG_0340[1]
cloth cabinet installed.
Date: 09/04/2014
Views: 45135
|
|
|
|
Landing gear Failure could be caused by too much over center.
Date: 06/12/2011
Views: 3579
|
|
|
29062002203122_G
Date: 12/31/1969
Views: 4012
|
|
|
|
Door sill conduit run 35.
Date: 08/16/2010
Views: 6271
|
|
|
DSCN6183
Date: 10/11/2009
Views: 5148
|
|
|
|
DSC08799
Port side
Date: 06/05/2012
Views: 41684
|
|
|
IM001693
Date: 10/29/2007
Views: 7521
|
|
|
|
CH29_11
Date: 07/17/2005
Views: 4707
|
|
|
29122008242_G
Date: 10/27/2009
Views: 6162
|
|
|
|
MG_2978
Date: 03/17/2008
Views: 4792
|
|
|
DSCN6586
Date: 10/25/2009
Views: 5387
|
|
|
|
2005oct08_15
Date: 11/29/1999
Views: 6312
|
|
|
24112003211038_G
Date: 12/31/1969
Views: 3878
|
|