|
|
DSC00086
Date: 12/31/1969
Views: 7927
|
|
|
IMG_2685
I elected to make up a support structure from some 12" 1 1/2 x 1 1/2 wide aluminum angle i had in my aluminum bin. Cut two lengths 5 1/2" long and clamped them to the base well centered and drilled out holes matching the base. Attached them t
Date: 04/09/2012
Views: 4928
|
|
|
|
IMG_5750post
Date: 08/09/2009
Views: 8752
|
|
|
BrakeLineRout07
Date: 02/19/2004
Views: 4381
|
|
|
|
2005_DSCF0054_16_1
Date: 02/04/2009
Views: 4805
|
|
|
IM003588
Date: 11/18/2007
Views: 9312
|
|
|
|
IMG_1415
Continuing work on the brake plumbing. And the usual wheel pants and gear leg fairing work.
Date: 05/28/2011
Views: 5921
|
|
|
Door hinge rebate dig 9.
Date: 09/18/2009
Views: 4902
|
|
|
|
Gap fill 2.
Date: 10/28/2009
Views: 6322
|
|
|
A022603pained3
Date: 12/31/1969
Views: 4095
|
|
|
|
DSCF0003_001
Date: 08/03/2009
Views: 4724
|
|
|
Fit baggage bay bulkhead - floor before fitting fairings Frans
Date: 12/08/2010
Views: 6998
|
|
|
|
Mvc_155s
Date: 12/31/1969
Views: 6467
|
|
|
dscn0372
Date: 12/31/1969
Views: 4834
|
|
|
|
DSCF0013_002
Date: 07/27/2009
Views: 4842
|
|
|
P9010092
Date: 09/01/2007
Views: 7539
|
|
|
|
IMG_2341
Date: 07/13/2005
Views: 5461
|
|
|
IMG_6440Ann
Date: 12/24/2007
Views: 6817
|
|
|
|
DSCN5961Ann
Date: 05/02/2007
Views: 4639
|
|
|
Gap fill 5.
Date: 10/28/2009
Views: 5404
|
|