|
|
DSCF0008
Date: 07/15/2009
Views: 6636
|
|
|
IMG_0235
Date: 02/01/2014
Views: 51165
|
|
|
|
Rotax setup for certified 914s.
Date: 03/06/2007
Views: 11552
|
|
|
DSCN6434
Date: 10/24/2009
Views: 6308
|
|
|
|
3M Flowable Finishing Putty 1.
Date: 10/07/2009
Views: 8080
|
|
|
IMG_7941Ann
Date: 06/28/2008
Views: 4524
|
|
|
|
img0923copy
Date: 07/29/2007
Views: 5097
|
|
|
DSCN6058
Date: 10/11/2009
Views: 5782
|
|
|
|
Condition Inspection P2 T
Date: 02/04/2010
Views: 4584
|
|
|
PARTS REVISION PAGES ROTAX 914
Date: 08/08/2010
Views: 4922
|
|
|
|
IMG_8066Ann
Date: 07/06/2008
Views: 5640
|
|
|
SB18 Motorglider Airbrakes Y10-09
Date: 08/14/2011
Views: 4733
|
|
|
|
22052011611
Date: 05/22/2011
Views: 6081
|
|
|
110_1046_IMG_001
Date: 03/02/2004
Views: 6688
|
|
|
|
LGRetractPlates00
Date: 02/09/2004
Views: 4548
|
|
|
LGBungee00
Date: 02/11/2004
Views: 4113
|
|
|
|
Peenemunde_V2
Date: 05/23/2009
Views: 5117
|
|
|
IMG_0901
Date: 11/22/2005
Views: 5377
|
|
|
|
IMG_7666Ann
Date: 04/26/2008
Views: 4169
|
|
|
nex_2013_08_24_01
Stb. side ribs 3 and 4 epibond in place with the 3 layups on all sides. At this point I was getting faster at doing layups however I only did one side at a time.
Date: 08/25/2013
Views: 17565
|
|