| 
 | 
 
Scandinavia_658
 
Date: 06/13/2004
 
Views: 5844
 
 
 | 
 | 
 | 
 
DSCN3912
 
Date: 09/30/2005
 
Views: 5097
 
 
 | 
 | 
| 
 | 
 
Vertical upright, swing-arm and generator install 7 of 7.
 
Date: 08/06/2003
 
Views: 8554
 
 
 | 
 | 
 | 
 
DSCF0626
 
Date: 07/25/2003
 
Views: 7574
 
 
 | 
 | 
| 
 | 
 
Tailplane_87
 
Date: 01/23/2006
 
Views: 3563
 
 
 | 
 | 
 | 
 
nex_2013_08_24_04
 
As you see here the port side is done with rib 3 and 4. I didn't have photos of doing the layups.
 
Date: 08/25/2013
 
Views: 17040
 
 
 | 
 | 
| 
 | 
 
IMG_2863Ann
 
Date: 12/06/2008
 
Views: 5576
 
 
 | 
 | 
 | 
 
Single point ground 5.
 
Date: 06/08/2010
 
Views: 5263
 
 
 | 
 | 
| 
 | 
 
DSC00057
 
Date: 05/20/2003
 
Views: 11412
 
 
 | 
 | 
 | 
 
25092002172644_G
 
Date: 12/31/1969
 
Views: 3850
 
 
 | 
 | 
| 
 | 
 
Starboard wing 48.
 
Date: 06/19/2009
 
Views: 5721
 
 
 | 
 | 
 | 
 
IMG_0237
 
Fuselage in the truck
 
Date: 02/01/2014
 
Views: 54510
 
 
 | 
 | 
| 
 | 
 
AltInst4
 
Date: 05/20/2007
 
Views: 4414
 
 
 | 
 | 
 | 
 
P1010716
 
Date: 11/29/1999
 
Views: 5162
 
 
 | 
 | 
| 
 | 
 
MVC_004S
 
Date: 06/03/2007
 
Views: 6456
 
 
 | 
 | 
 | 
 
IMG_1405
 
Put the stabs back on and check them out and checked out the trim for operation.  All OK.
 
Date: 05/27/2011
 
Views: 5520
 
 
 | 
 | 
| 
 | 
 
Cobra_head_front
 
Front view of cobra head modification.  A vane was added to help smooth flow of air into the carb.  The vane runs the length of the cobra head and extends about 1 inch into the carburetor throat.  It seems to have helped even out the CHTs and EGSs between
 
Date: 11/05/2011
 
Views: 149862
 
 
 | 
 | 
 | 
 
Oshkosh_2009_048
 
Date: 07/29/2009
 
Views: 8390
 
 
 | 
 | 
| 
 | 
 
JB KWIK aileron dam 3.
 
Date: 09/27/2010
 
Views: 5932
 
 
 | 
 | 
 | 
 
74_3port_fuel_outlet
 
Date: 12/31/1969
 
Views: 4089
 
 
 | 
 |