|
|
Front Starboard fuse stiffening for lift socket 8.
Date: 10/24/2010
Views: 6422
|
|
|
IMG_8539
Date: 07/08/2014
Views: 11027
|
|
|
|
IMG_2195
Date: 01/12/2005
Views: 4875
|
|
|
ELT_BNC_90_3
Date: 04/22/2009
Views: 6896
|
|
|
|
IMG_5689Ann
Date: 10/07/2007
Views: 5633
|
|
|
FuelFiller09Ann
Date: 07/01/2004
Views: 21850
|
|
|
|
Fin cap install 6.
Date: 05/07/2009
Views: 8690
|
|
|
Mass_Balance_Tower_43
Date: 01/23/2006
Views: 5710
|
|
|
|
Archer_6_antenna_install_02
Date: 01/23/2009
Views: 5976
|
|
|
Door sill conduit run 12.
Date: 08/11/2010
Views: 6236
|
|
|
|
IMG_0851
Date: 11/17/2005
Views: 5870
|
|
|
Homegrown 10mm banjo for Aeroquip 666 -two.
Date: 10/30/2007
Views: 8853
|
|
|
|
Powdercoatoven4_001
Date: 02/11/2006
Views: 5040
|
|
|
A010803U18_1
Date: 12/31/1969
Views: 4702
|
|
|
|
IMG_1898_001
Date: 09/16/2004
Views: 5757
|
|
|
Gap fill 4.
Date: 10/28/2009
Views: 5233
|
|
|
|
Ledd_fishitit2
Date: 02/01/2009
Views: 6127
|
|
|
P1010142
Date: 11/29/1999
Views: 5024
|
|
|
|
DSCN6594
Date: 10/25/2009
Views: 4601
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 193360
|
|