|
IMG_2603
I replaced the float bowl, torqued the "nut" to 48.7 ft-lbs and safety wired it as per Rotax specs.
Date: 05/30/2012
Views: 4866
|
|
|
IMG_1446ann
Final brake plumbing and other stuff installed below the tunnel.
Date: 06/04/2011
Views: 4016
|
|
|
Panel population 3.
Date: 03/01/2010
Views: 6911
|
|
|
HR3
Date: 12/09/2008
Views: 6338
|
|
|
Caernarfon_EGCK_Noth_Wales
Date: 04/21/2009
Views: 4538
|
|
|
IMG_5729ann
Date: 07/25/2009
Views: 4968
|
|
|
DSCN8274
Date: 09/18/2010
Views: 4200
|
|
|
dscn1801
Date: 12/31/1969
Views: 3627
|
|
|
01052003204623_G
Date: 12/31/1969
Views: 4002
|
|
|
30_09_07_5
Date: 09/30/2007
Views: 5552
|
|
|
DSCF0076
Date: 10/26/2009
Views: 4032
|
|
|
Aligning_wings_pins_06
Date: 04/15/2006
Views: 5657
|
|
|
panel_2
Date: 12/31/1969
Views: 5099
|
|
|
081002_filling2
Date: 12/31/1969
Views: 3108
|
|
|
010802_aileron_adjusting
Date: 12/31/1969
Views: 4348
|
|
|
Ceiling panel 6 pin Molex connector schematic.
Date: 04/15/2009
Views: 5249
|
|
|
smDSCN2017
Date: 12/31/1969
Views: 4854
|
|
|
IMG_6957
Front side of the new tank.
Date: 10/17/2013
Views: 6156
|
|
|
dscn0944
Date: 12/31/1999
Views: 4420
|
|
|
IMG_3072
Date: 01/01/2011
Views: 6831
|
|