|
DSCN6132
Date: 10/11/2009
Views: 4373
|
|
|
Turnbuckle / cable tangle 2.
Date: 05/31/2009
Views: 5080
|
|
|
Flap extension 1
Date: 10/30/2013
Views: 4628
|
|
|
Door hinge rebates 31.
Date: 11/06/2009
Views: 3403
|
|
|
Tailplane_75
Date: 01/23/2006
Views: 2915
|
|
|
LR tank transfer punp
Date: 09/18/2010
Views: 5797
|
|
|
Prestwick_Scotland_EGPK_1_6_09_air_to_air_Tanker
Date: 06/01/2009
Views: 5373
|
|
|
Noise_1
Date: 03/07/2009
Views: 4428
|
|
|
DSCN3853
Date: 07/01/2005
Views: 4174
|
|
|
IMG_2310
Date: 05/24/2005
Views: 4873
|
|
|
Taking_off_runway_27_Gibraltar
Date: 07/02/2009
Views: 6617
|
|
|
108_0811_IMG
Date: 10/11/2003
Views: 7832
|
|
|
IMG_2552_copy_3_1
Date: 04/19/2008
Views: 4649
|
|
|
CH8_31
Date: 12/31/1969
Views: 7795
|
|
|
Bonding of Starboard lift pin sockets 8.
Date: 10/19/2010
Views: 5048
|
|
|
P8310059
Date: 08/31/2007
Views: 7848
|
|
|
IMG_6625Ann
Date: 01/27/2008
Views: 4588
|
|
|
DSCN4005
Date: 10/31/2005
Views: 4797
|
|
|
DSCN6520
Date: 10/25/2009
Views: 3701
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 155208
|
|