|
|
IMGA0701
First wings L.E layed up and peel plyed. The blue foam is keeping in place a 90 degree strip which is keeping the end of the uni cloth bent under to aid bonding to the rear of the spar. A helpful tip from Mike Gregory.......Oh wanted to say it took 8 and
Date: 04/20/2013
Views: 112176
|
|
|
Fitting_Wings_31
Date: 06/07/2007
Views: 8038
|
|
|
|
dscn2023
Date: 12/31/1969
Views: 4096
|
|
|
DSC00069
Date: 12/31/1969
Views: 6265
|
|
|
|
WingSet15Ann
Date: 07/13/2004
Views: 5434
|
|
|
IMG_2259
Date: 02/23/2005
Views: 6973
|
|
|
|
FuelSystemMod42Ann
Date: 04/28/2004
Views: 4148
|
|
|
Dynon AOA audio pot 1.
Date: 08/04/2010
Views: 11325
|
|
|
|
IM003420
Date: 10/31/2007
Views: 9210
|
|
|
Broken edge of starboard aileron 6.
Date: 09/28/2010
Views: 9264
|
|
|
|
DSCN6273
Date: 10/11/2009
Views: 5226
|
|
|
Mallorca
Mallorca LEPA
Date: 08/23/2004
Views: 6826
|
|
|
|
Wing fairings Justin on raising flap and adjusting trim with fairing
Date: 11/29/2010
Views: 4550
|
|
|
IMG_6624Ann
Date: 01/27/2008
Views: 4298
|
|
|
|
IMG_7686.jpg
Date: 08/05/2012
Views: 18262
|
|
|
IMG_6364Ann
Date: 12/11/2007
Views: 5427
|
|
|
|
Baggage_Area_04
Date: 01/22/2006
Views: 7220
|
|
|
109_0939_IMG
Date: 01/12/2004
Views: 7129
|
|
|
|
IMG_0187.JPG (2)
Workshop kitted out. All done in 3 weeks!
Date: 04/13/2014
Views: 46564
|
|
|
CH34_09
Date: 03/12/2006
Views: 6449
|
|