|
|
IMG_5677Ann
Date: 10/05/2007
Views: 7328
|
|
|
04_G
Date: 06/19/2009
Views: 4984
|
|
|
|
IMG_0294
Date: 04/16/2005
Views: 4352
|
|
|
Mid panel insert schematic for items that have connectors.
Date: 06/08/2010
Views: 12201
|
|
|
|
Incidence meter 3.
Date: 10/20/2010
Views: 6140
|
|
|
A011403_panel_2
Date: 12/31/1969
Views: 4673
|
|
|
|
dscn1277
Date: 12/31/1969
Views: 4688
|
|
|
2006SnF010
Date: 04/07/2006
Views: 9840
|
|
|
|
CBM - ANNEX E(T)1
Date: 11/18/2013
Views: 4575
|
|
|
Strobe_1
Date: 02/17/2009
Views: 6376
|
|
|
|
Front_Door_Open
Date: 09/02/2004
Views: 5264
|
|
|
nex_2013_08_24_04
As you see here the port side is done with rib 3 and 4. I didn't have photos of doing the layups.
Date: 08/25/2013
Views: 17395
|
|
|
|
DSCN4652Ann
Date: 08/13/2006
Views: 4997
|
|
|
IMG_0825
Date: 11/16/2005
Views: 5247
|
|
|
|
Bb8
Date: 02/01/2009
Views: 7757
|
|
|
IMG_2074
Date: 12/01/2004
Views: 6614
|
|
|
|
IMG_1431ann
Continuing work on the fill/sand
Date: 12/21/2010
Views: 5307
|
|
|
Port aft striker as seen through fuse hole.
Date: 01/03/2010
Views: 5831
|
|
|
|
Gallows_3
Date: 10/24/2009
Views: 6654
|
|
|
Gap fill 1.
Date: 10/28/2009
Views: 5437
|
|