Login
EuropaOwners Random Items Lay1
Advanced Search
View Slideshow (Fullscreen)

Random Images

IMG_0772

IMG_0772

Date: 01/04/2006 Views: 5613

CableChannel03Ann

CableChannel03Ann

Date: 06/07/2004 Views: 3357

Door tang and hinge drilling tools 2.

Door tang and hinge drilling tools 2.

Date: 11/01/2009 Views: 3951

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693524

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693524

Lay1

3 BID layup complete. Once cured just need to remove registration foam/JB Weld/packaging tape from center and install a Tufnal rudder cable guide. As an afterthought (Wayne's), should have staggered the the edges (width) as well as the length.
Y9-02-02

Date: 02/02/2009
Size:
Full size: 600x800
Lay1

Photo Properties

summary  details
Make Apple Model iPhone
Aperture Value f/2.8 Color Space sRGB
Date/Time Mon 02 Feb 2009 10:38:26 PM UTC GPS: Latitude 40.798166666667
GPS: Longitude 73.1065
Powered by Gallery v2.3