Starboard flange will be reduced to prevent so much seal bulging out. Y9-11-27
Date: 11/18/2009
Views: 5040
Flugzeugabsturz_22_08_2008_Marchtrenk_014
Date: 08/22/2008
Views: 6308
Filled repair.
Date: 07/18/2009
Views: 4801
Newest Image
EAA SITE
Date: 08/23/2023
Views: 705939
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 705939
IMG_6969
The top of the back rest removed. The rotary tool could not get into the area on the sides. A hacksaw blade was recruited for that effort. And it was an effort!