Brackets are mounted. Wayne is about half way done with PCB.
Date: 07/15/2010
Views: 8037
DSCF0007_001
Date: 07/27/2009
Views: 5740
CH8_1
Date: 12/31/1969
Views: 8780
Newest Image
EAA SITE
Date: 08/23/2023
Views: 793568
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 793568
Fin rib layup 2.
Vertical fin rib to fin 2 BID layup complete after 36 grit then 80 grit wakeup scuff, then wet out, then flox, then 2 BID layup.
Peel plied for subsequent lower horizontal rib front flange layup, (necessary mutilation to fit lower rib had front flange being removed).
Think it's a good thing remembered to install "T" bar before bonding in place sternpost. If forgotten, think would need to mutilate aft "T" bar guide on bottom to allow contortion for probable insertion, (but perhaps not!).
Y9-05-04