Login
EuropaOwners Random Items Port bottom strengthening.
Advanced Search
View Slideshow (Fullscreen)

Random Images

Tank cleaning, through vent and sender with borescope.

Tank cleaning, through vent and sender with borescope.

Date: 06/28/2010 Views: 8728

Tallin EETN  Estonia

Tallin EETN Estonia

Date: 06/07/2005 Views: 6824

Mod_70_04

Mod_70_04

Date: 04/15/2006 Views: 7157

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 704784

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 704784

Port bottom strengthening.

Flange was removed to allow module to fit on top of tunnel, and we also removed a portion of tunnel in module that was meant for sight gauge because we needed clearance for our pilot/co-pilot switch connections. Anyway this is where we want to mount port lower bracket that ties to firewall and it is just not strong enough. Resolution is a carbon fiber rod and a piece of 1/8plywood.
CF here floxed in place. Tip without wood will be 2 BID and the end with wood will also be 2 BID.
Y10-01-24

Date: 01/20/2010
Size:
Full size: 2592x1944
Port bottom strengthening.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/4.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Thu 21 Jan 2010 01:17:13 AM UTC
Powered by Gallery v2.3