Login
EuropaOwners Random Items Second and final pass of Port top wingskin bond on 10.
Advanced Search
View Slideshow (Fullscreen)

Random Images

Door sill conduit run 39.

Door sill conduit run 39.

Date: 08/26/2010 Views: 7252

Compton_Abbas_EGHA

Compton_Abbas_EGHA

Date: 07/25/2009 Views: 5803

About_to_try_winch_No3

About_to_try_winch_No3

Date: 09/03/2004 Views: 8623

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 804847

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 804847

Second and final pass of Port top wingskin bond on 10.

Used:
3 oz to wet out
4 oz floxed
4 oz floxed
for final bond on pass.
Y10-09-13

Date: 09/13/2010
Size:
Full size: 2592x1944
Second and final pass of Port top wingskin bond on 10.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/4.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Mon 13 Sep 2010 10:24:53 PM UTC
Powered by Gallery v2.3