Login
EuropaOwners Random Items Completion of Port top skin bond on 66.
Advanced Search
View Slideshow (Fullscreen)

Random Images

Paul's conduit 5.

Paul's conduit 5.

Date: 07/27/2010 Views: 5259

IMG_2086

IMG_2086

Date: 12/01/2004 Views: 7676

dscn1013

dscn1013

Date: 12/31/1969 Views: 4006

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 725976

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 725976

Completion of Port top skin bond on 66.

First attempt to make a dam of JB KWIK as a guide for filling aileron hollow between mass balance arms so aileron matches the bottom of wing.
We set the aileron to the neutral position and clamped, then inserted a thin scrap of aluminum facia trim that was covered with 3M 375 tape and set it 90° to aileron bottom leading edge and jammed it tight with shims carved out from mixing sticks. (Toothpicks make great wedges).
Taped the top edge of aluminium back with 3M 375 to hold it at 90°.
This attempt was a failure, we moved on to better solution.
Y10-09-24

Date: 09/23/2010
Size:
Full size: 2592x1944
Completion of Port top skin bond on 66.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/4.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Thu 23 Sep 2010 10:17:43 PM UTC
Powered by Gallery v2.3