Login
EuropaOwners Random Items Front Starboard fuse stiffening for lift socket 1.
Advanced Search
View Slideshow (Fullscreen)

Random Images

Klaus 9

Klaus 9

Date: 09/08/2001 Views: 7557

24062002180047_G

24062002180047_G

Date: 12/31/1969 Views: 3437

IMG_1431ann

IMG_1431ann

Date: 12/21/2010 Views: 5307

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 769704

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 769704

Front Starboard fuse stiffening for lift socket 1.

This is the jig we used to sand down foam to 5/16" thickness for reinforcement of inside front of fuse.
We removed the stiff plastic coating on other side of foam as well to make for a good bonding surface. The tape acts as guide to indicate when you have sanded enough. We are using 80 grit sandpaper.
We used double face tape to keep the foam from sliding in jig and compressing around thinned area by the holes.
I made some "wooden nickles" with holes to plug up area around bolts and washers.
Y10-10-25

Date: 10/23/2010
Size:
Full size: 1800x1350
Front Starboard fuse stiffening for lift socket 1.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 1/30 sec Date/Time Sun 24 Oct 2010 01:43:18 AM UTC
Powered by Gallery v2.3