Date: 03/17/2008 Views: 5641
Date: 09/04/2010 Views: 4803
Date: 06/14/2018 Views: 45824
Date: 08/23/2023 Views: 798521
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09