Ron and Alan took turns working on starboard bracket.
Date: 01/20/2010
Views: 6398
First pass of Port top wingskin bond on 16.
Date: 09/11/2010
Views: 5519
dscn0042
Date: 12/31/1969
Views: 4490
Newest Image
EAA SITE
Date: 08/23/2023
Views: 693400
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 693400
Strober_1
8-32 Nutplates added to make install easier.
Whatever type of aluminium Kuntzleman used to make power supply box, boy is it mushy, and boy does it machine poor. Drill mushes through and leaves a bump/burr. Even though was using a piloted countersink with precision stop, it tended to walk mushing hole to wrong location.
To prevent walking, inserting screw from behind so tip was flush with bottom surface and clamping with needle nose vise grip allowed use of nutplate as guide which helped.
Y9-05-18