Vertical upright, swing-arm and generator install 7 of 7.
Date: 08/06/2003
Views: 7297
E_install_3
Date: 04/24/2009
Views: 4629
Newest Image
EAA SITE
Date: 08/23/2023
Views: 693623
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 693623
Lower horizontal done 5.
All 3 ribs got 1 BID each side of conduit hole. Top rib got a scuff sanding for a dab of Redux to hold conduit in place by safety wire tail.
Middle and lower rib got a new front flange, and all 3 got rear flange mutilated and remade in some fashion.
Y9-05-08