Date: 10/27/2008 Views: 6887
Date: 04/15/2005 Views: 5959
Date: 12/23/2006 Views: 5008
Date: 08/23/2023 Views: 792979
The transparent hose on the hose barb which has been threaded into the main tank (port) fuel manifold. A dose of LocTite stick pipe dope was applied to the threads of the hose barb before it was screwed in.