Date: 12/31/1969 Views: 9761
Date: 12/01/2004 Views: 8019
Date: 04/09/2016 Views: 14349
Date: 08/23/2023 Views: 793365
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.