Login
EuropaOwners Random Items RudderMount29Ann
Advanced Search
View Slideshow (Fullscreen)

Random Images

109_0907_IMG

109_0907_IMG

Date: 01/02/2004 Views: 6714

Landing gear mounting frame removal Nev- Bob

Landing gear mounting frame removal Nev- Bob

Date: 10/19/2010 Views: 3262

Tailplane_61

Tailplane_61

Date: 01/23/2006 Views: 3651

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 801763

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 801763

RudderMount29Ann

A batch of epoxy was mixed and the hinge reinforcements laid up on peel-ply. A bit of epoxy was applied to the areas to be reinforced and the reinforcement layups were put in place.

Date: 07/01/2004
Full size: 480x640
RudderMount29Ann

Photo Properties

summary  details
Make NIKON Model E775
Aperture Value f/2.8 Color Space Uncalibrated
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash Focal Length 5.8 mm
ISO 100 Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Thu 01 Jul 2004 08:55:22 PM UTC
IPTC: Caption
Powered by Gallery v2.3