Date: 06/11/2004 Views: 10206
Date: 12/31/1969 Views: 4415
Date: 12/31/1969 Views: 4072
Date: 08/23/2023 Views: 769035
Mixed up a batch of epoxy and applied two plies of BID over the inside of the guides to the fuselage. The port fore bolt-shoot guide bonded with Araldite and with 2 plies of BID laid up over.