Date: 10/24/2010 Views: 8978
Date: 12/31/1969 Views: 4128
Date: 07/26/2014 Views: 8907
Date: 08/23/2023 Views: 844593
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.