Date: 06/21/2008 Views: 4269
Date: 05/01/2005 Views: 4033
Date: 10/25/2009 Views: 7101
Date: 08/23/2023 Views: 793015
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.