Date: 12/31/1969 Views: 8285
Date: 09/21/2005 Views: 6407
Date: 03/21/2009 Views: 8076
Date: 08/23/2023 Views: 723654
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.