Login
EuropaOwners Random Items IMG_0057_Ann
Advanced Search
View Slideshow (Fullscreen)

Random Images

Tube shaped and held in place with JB KWIK Weld.

Tube shaped and held in place with JB KWIK Weld.

Date: 01/20/2010 Views: 6543

N4211W wing rigging 16.

N4211W wing rigging 16.

Date: 10/09/2010 Views: 7787

IntercoolerPg1

IntercoolerPg1

Date: 01/07/2006 Views: 7080

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 784477

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 784477

IMG_0057_Ann

Next, check the wing incidences. They all should be equal at 2.5 deg. By this time you are going round and round adjusting one thing and checking for that adjustment before going back to check all the other angles because that adjustment changed them so more adjustments are needed. Basicly, you never get them all exactly where you want them. You just hope to get any errors smoothed out and spread evenly amongst all the wings. When this was done they moved on to setting up the tail. Flying and landing wires are tensioned. Tail incidence is set to the same 2.5 deg as the wings. This is done with washers and spacers. After the aircraft is flying, further adjustments will be required to come to a final setting. When all are as close to correct as can be achieved, a set of spacers will be made up and proper length bolts used to finalize the tail position.

Date: 09/14/2008
Size:
Full size: 1600x1200
IMG_0057_Ann

Photo Properties

summary  details
Make Apple Model iPhone
Aperture Value f/2.8 Color Space Uncalibrated
Date/Time Sat 13 Sep 2008 10:00:24 AM UTC GPS: Latitude 33.056
GPS: Longitude 97.248333333333
Powered by Gallery v2.3