Vertical upright, swing-arm and generator install 5 of 7.
Date: 08/12/2003
Views: 10228
ALFRED UPSTOP 2
Date: 02/16/2015
Views: 18251
DSCN5091
Date: 12/14/2006
Views: 9818
Newest Image
EAA SITE
Date: 08/23/2023
Views: 771655
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 771655
Overall shot and description.
Here is an overall shot of what we have done to our instrument module:
1) Right center plywood connects top of module with the center middle.
2) Antenna tube connecting radio molding to right side.
3) Starboard bracket support which also connects the top and bottom of module.
4) Port bracket support made from plywood and garbage picked carbon fiber arrow shaft stiffened this area very nicely after we weakened it by removing some of the sight gauge tunnel
5) Number 5 is missing in pic but it is the right side taper built up to 3/8" to compensate for warp. Again, warp began as 3/4", but heating and clamping brought it down to a stable 3/8".
Y10-01-25