Login
EuropaOwners Random Items Battery Switch operation.
Advanced Search
View Slideshow (Fullscreen)

Random Images

CH4_2

CH4_2

Date: 12/31/1969 Views: 12921

Fin cap 11.

Fin cap 11.

Date: 03/20/2009 Views: 13229

Peenemunde_EDCP_1

Peenemunde_EDCP_1

Date: 05/22/2009 Views: 6472

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 748513

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 748513

Battery Switch operation.

Battery Switch operation.
"Basically the controls are just by my left wrist in
the left seat, spring-loaded to go aft. Aft is OFF. The control knobs sit in
slots, and will spring aft if not in the Power-On slot (or if the cable
snaps, etc.) The cables snake aft to the Switch Board which holds the
switches in the ‘fuselage behind the second bulkhead – see above), The
switches take the battery(s) power and deliver to the firewall port side via
1/2inch copper pipe with CCA#4 cable. I hope that makes it a bit clearer –
sorry for all the Mbits."
Y10-02-14

Date: 02/22/2010
Full size: 465x640
Battery Switch operation.
Powered by Gallery v2.3