Date: 12/31/1969 Views: 3929
Date: 07/03/2008 Views: 6761
Date: 09/02/2009 Views: 6582
Date: 08/23/2023 Views: 772365
The narrow washer or spacer was bonded down with J-B Weld and allowed to cure for two days. The brake was put back on the landing gear and the banjo hose end fastened down.