Date: 06/13/2007 Views: 5028
Date: 01/23/2009 Views: 6927
Date: 06/05/2009 Views: 5688
Date: 08/23/2023 Views: 725715
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09