Date: 01/23/2006 Views: 4740
Date: 06/24/2006 Views: 3750
Date: 11/03/2009 Views: 4473
Date: 08/23/2023 Views: 693463
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09