Login
EuropaOwners Random Items Tie-bar 4.
Advanced Search
View Slideshow (Fullscreen)

Random Images

IMG_0513

IMG_0513

Date: 10/13/2008 Views: 6049

IMG_7715Ann

IMG_7715Ann

Date: 06/07/2008 Views: 5860

dscn0619

dscn0619

Date: 12/31/1969 Views: 4325

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693575

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693575

Tie-bar 4.

I cut one of the 1/4 -28 bolts too short the other night.
OK, so I ordered a box from McMaster Carr.
Alan got the job of cutting down the bolts tonight and he too cut the first one too short!
Anyway, we now have the four 1/4-28 bolts with about 3 threads showing.
Early on when we 4 BID the inboard side of the aft pad, we Floxxed it first to get the pad pretty flat.
It worked great, not very much fill will be needed upon final install. We are going to use Redux / Flox for the fill / bonding.
Here you can see the two front lines we used for targeting the second 1/4" hole.
Alan was inside fuse on his head sighting to get proper alignment. He was targeting the middle line on the inner socket between the two lines on the green tape on the fuse.
Y10-11-11

Date: 11/10/2010
Size:
Full size: 1900x1425
Tie-bar 4.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/4.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Wed 10 Nov 2010 11:36:06 PM UTC
Powered by Gallery v2.3