Date: 06/12/2007 Views: 5878
Date: 09/07/2004 Views: 3503
Date: 11/11/2005 Views: 8368
Date: 08/23/2023 Views: 836902
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.