|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 12111
|
|
|
IMG_2273
Date: 02/25/2005
Views: 2551
|
|
|
Raimo refueling 1
Date: 04/09/2007
Views: 4428
|
|
|
IMG_2438
Date: 12/11/2005
Views: 3407
|
|
|
Hot 914.
Date: 03/06/2007
Views: 4799
|
|
|
dscn1703
Date: 12/31/1969
Views: 2365
|
|
|
IMG_2125
Date: 12/15/2004
Views: 2925
|
|
|
DSCF0111
Date: 06/22/2009
Views: 6966
|
|
|
DSCN3915
Date: 09/30/2005
Views: 5417
|
|
|
IMG_0272post
Date: 09/17/2010
Views: 3786
|
|
|
DSCN6052
Date: 11/29/1999
Views: 3202
|
|
|
Boy, under an oz each side.
Date: 10/07/2009
Views: 2777
|
|
|
IMG_2321
Date: 06/21/2005
Views: 2922
|
|
|
Rotax Tachometer 1.
Date: 03/26/2009
Views: 5849
|
|
|
13062003173406_G
Date: 12/31/1969
Views: 2354
|
|
|
DSCN6372
Date: 10/11/2009
Views: 3000
|
|
|
111002_glassluver
Date: 12/31/1969
Views: 2581
|
|
|
IM002958
Date: 10/30/2007
Views: 3765
|
|
|
IMG_2443
Date: 12/12/2005
Views: 2845
|
|
|
Port_door_4_Y9_06_07
Date: 06/07/2009
Views: 2509
|
|