|
CBM - 1 - INTRODUCTION 2 Paul(2)
Date: 11/18/2013
Views: 1712
|
|
|
IMG_7226
Here the urethane on the aluminum ledge has also been covered with cork. The cork both served to protect the tank and the urethane.
Date: 01/19/2014
Views: 4035
|
|
|
Denmark_KZ_rally
Date: 12/31/1969
Views: 3000
|
|
|
Gap fill 4.
Date: 10/28/2009
Views: 2605
|
|
|
DSCN1412
Date: 10/10/2009
Views: 2690
|
|
|
04Rudder_vacuum
Date: 12/31/1969
Views: 3991
|
|
|
dscn0627
Date: 12/31/1969
Views: 2584
|
|
|
021302_wing_root
Date: 12/31/1969
Views: 3026
|
|
|
DSCN8188
Date: 09/18/2010
Views: 2971
|
|
|
OK, we are ready for in situation fitting to get correct length and angle of 1" tube
Date: 11/27/2013
Views: 3193
|
|
|
Ultimate ventilator installation and associated repair 10.
Date: 07/12/2009
Views: 2773
|
|
|
TailWheelMount13
Date: 02/03/2004
Views: 2685
|
|
|
IMG_0180
Date: 04/14/2005
Views: 2497
|
|
|
IMG_9288post
Date: 08/10/2009
Views: 2832
|
|
|
Mass_Balance_Tower_46
Date: 01/23/2006
Views: 2408
|
|
|
Mod 20
Date: 08/26/2010
Views: 1640
|
|
|
DSCN3916
Date: 09/30/2005
Views: 3039
|
|
|
DSCN8332
Date: 09/19/2010
Views: 2832
|
|
|
IMG_0046
Date: 03/21/2007
Views: 3479
|
|
|
MG_2913
Date: 03/17/2008
Views: 2710
|
|