Date: 10/09/2003 Views: 3027
Date: 02/14/2010 Views: 2893
Date: 07/10/2009 Views: 3236
Date: 08/23/2023 Views: 98308
Date: 05/23/2007 Views: 535980
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.