Three LED Oil Pressure assembly, CHT and OT LEDs, selector switch for Port / Stbd CHT and OT / Coolant selector switch are complete and ready for install. The switches first had a piece of adhesive lined heat shrink installed but only partially shrunk. The void was filled with Shoe Goo, and upon cure of Shoe Goo, the heatshrink was fully shrunk. An additional piece of heat shrink was then installed.
Y10-12-11