|
Length of coupler is ~ .855" cut down from 1". 9.5 times two is 19, so this allows minimum of 19 threads of engagement
Date: 12/13/2013
Views: 3222
|
|
|
Temporary mount using 1 flat head 1/4-28
Date: 12/13/2013
Views: 3282
|
|
|
The threaded portion of my "thunk" fits nicely inside this spacer
Date: 12/13/2013
Views: 3460
|
|
|
The 11/16-16 thread is not too common
Date: 12/13/2013
Views: 3131
|
|
|
I will leave ~ 1.25 diameters of thread engaging and remove all else
Date: 12/13/2013
Views: 3300
|
|
|
What an idiot, I turned off half the nut down to spacer OD to save a little weight
Date: 12/13/2013
Views: 3215
|
|
|
You can see I left a little space so the spacer can pinch the bearing when the nut is tightened
Date: 12/13/2013
Views: 3567
|
|
|
I'm going to Redux the nut in place and Redux/Flox the thread extender hang-over
Date: 12/13/2013
Views: 3387
|
|
|
1/2" ball end-mill on order (McMaster) to to mill a pocket in the brake master cylinder directly above the mounting holes
Date: 12/13/2013
Views: 3789
|
|
|
Using fore and aft the supplied by Europa for push-rod jam nuts that are .155" thick
Date: 12/13/2013
Views: 3138
|
|
|
The magic number is 1.990" from the forward pillow block bearing to the grove.
Date: 12/13/2013
Views: 3798
|
|
|
You can see the pillow block is aft of the threads
Date: 12/13/2013
Views: 3973
|
|
|
Aft mount
Date: 12/13/2013
Views: 3375
|
|
|
Overall view of front mount
Date: 12/13/2013
Views: 3537
|
|
|
Cut down 1" aft threaded rod to .700"
Date: 12/13/2013
Views: 3835
|
|
|
Cut down Heims to 1.700"
Date: 12/13/2013
Views: 3699
|
|
|
Supplied with cable nuts were .190" thick
Date: 12/13/2013
Views: 4323
|
|
|
Overall shot of push-rod replacement
Date: 12/13/2013
Views: 3894
|
|
|
Action of Aft Cable Mount mov. 2
Date: 12/13/2013
Views: 2139
|
|
|
Action of Front Cable Mount mov.
Date: 12/13/2013
Views: 2296
|
|