Both temperature indicators spot onto each other at 165°F.
Date: 02/16/2010
Views: 8091
IMG_1485s
Date: 06/10/2011
Views: 4548
Newest Image
EAA SITE
Date: 08/23/2023
Views: 807532
Port front spacer perfectly bonded in position.
Port front spacer perfectly bonded in position. Just need to remove double sticky tape.
Needed to Dremel out some areas of rebate, perhaps removed half of the fiberglass. Will strengthen with 2 BID from the bottom.
Used Dremel with both a Rotozip tool and long slender Tungsten Carbide grit to shape both port front and aft tang rebate area.
Y9-10-14