Ultimate ventilator installation and associated repair 4.
Date: 07/15/2009
Views: 7153
HeadlinerWiring15Ann
Date: 09/05/2005
Views: 3863
Newest Image
EAA SITE
Date: 08/23/2023
Views: 813553
Port front spacer perfectly bonded in position.
Port front spacer perfectly bonded in position. Just need to remove double sticky tape.
Needed to Dremel out some areas of rebate, perhaps removed half of the fiberglass. Will strengthen with 2 BID from the bottom.
Used Dremel with both a Rotozip tool and long slender Tungsten Carbide grit to shape both port front and aft tang rebate area.
Y9-10-14