Date: 04/08/2007 Views: 5004
Date: 08/13/2010 Views: 8567
Date: 12/01/2004 Views: 6971
Date: 08/23/2023 Views: 827064
One of the outer bushings got drilled through with a larger drill used for drain on bottom during accelerated construction. Thus pip pin could not grab. Next size up pip pins were sent, but we chose solid shoulder screw retention.